Boley’s Smart Foundation Repair uses a double pier system as outlined in the diagram on the right.

At each piling location we will hand dig a hole that is approximately two to three feet square. Any plants, which may be in the way, are removed and relocated if possible.

Once the hand dug holes are completed, we will begin to install the pilings. Each pile section is hydraulically driven beneath the foundation, adding as many sections as necessary, to reach bedrock or refusal.

After all pilings are installed, the leveling process begins.  During the leveling process Hydraulic Jacks and Steel Shims are used to fine tune the leveling.  A Zip Level (Compulevel) is used to bring the slab to the appropriate elevations.

When all leveling is completed, the holes are then backfilled, and plants are replanted (where possible).

Unless interior pilings are installed, we will only need access inside your home during the leveling process. We will need access to your water, electricity, and breaker box at all times during the repair process.


Click here to schedule an appointment!

 

Why Choose Us?

  • Free Estimates
  • Realtor Discounts
  • Senior Citizen Discounts
  • Engineers Certification
  • Dependable Reliable Service
  • Local to the Central Texas Area

  Home     Slab     Pier & Beam     About Us     Contact Us  

Contact
Phone: 254.780.1220   Fax: 888.887.1499
Copyright 2010 Boley’s Smart Foundation Repair - All rights reserved
| Site by Boley Technical Services - Powered by PrimeSite™
Printer-Friendly Version