Boley’s Smart Foundation Repair uses a double pier system as outlined in the
diagram on the right.
At each piling location we will hand dig a hole that is approximately two to three feet square. Any plants, which may be in the way, are removed and relocated if possible.
Once the hand dug holes are completed, we will begin to install the pilings. Each pile section is hydraulically driven beneath the foundation, adding as many sections as necessary, to reach bedrock or refusal.
After all pilings are installed, the leveling process begins. During the leveling process Hydraulic Jacks and Steel Shims are used to fine tune the leveling. A Zip Level (Compulevel) is used to bring the slab to the appropriate elevations.
When all leveling is completed, the holes are then backfilled, and plants are replanted (where possible).
Unless interior pilings are installed, we will only need access inside your home during the leveling process. We will need access to your water, electricity, and breaker box at all times during the repair process.
|